Gotham ROUGH-IN SECTION FOR DPH Bedienungsanleitung Seite 1

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Beleuchtung Gotham ROUGH-IN SECTION FOR DPH herunter. Gotham ROUGH-IN SECTION FOR DPH User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 2
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
For Your Protection, Read Carefully
- Risk of fire. Do not install insu-
lation within 3 inches of fixture sides or wir-
ing compartment, nor above the fixture in
such a manner as to entrap heat.
· Turn off the power supply.
· Ground the fixture to avoid potential
electrical shocks.
· Do not handle an energized fixture or
energize any fixture with wet hands,
when standing on a wet or damp sur-
face, or in water.
· Double check all electrical connections
to be sure they are tight and correct.
· Match wattage of fixture and lamp ex-
actly.
· Do not remove or insert lamp when power
is on.
· Do not scratch glass or subject lamp to
undue pressure as either may cause
lamp breakage.
· Protect operating lamp from sources
of moisture.
Upon receipt, thoroughly inspect for any
freight damage which should be brought to
the attention of the delivery carrier. Compare
the catalog description listed on the packing
slip with the label on the carton to ensure you
have received the correct merchandise.
On 24” centers (16” or 24” O.C. for 4” fixture)
utilizing solid type (non-accessible) ceiling (dry-
wall, plaster, etc.).
1. Open lever (C) securing bar hangers - bend
ends of hangers 90° (D) to be used as nailing
tabs, center in the vertical slot, and close lever
(C) to lock; repeat on opposite side.
Refer to Fig-
ure 1.
2. Secure a piece of plywood (E) to temporarily
span the bottom of the joists to support the fix-
ture housing while attaching the bar hangers
(F) to the joists. This will position the housing
correctly for drywall installer to provide pilot
hole (G) to locate fixture after ceiling has been
installed.
Refer to Figure 2.
3.
Return
and complete following steps after feed wire
connections have been made.
4. Using 1/8” router follow outside of plaster
frame to cut hole in ceiling.
5. Loosen (2) 5/16” screws (A) 180° apart, al-
lowing fixture to drop down so bottom edge of
plaster flange will be slightly above edge of ceil-
ing material.
1. Install ceiling panel in t-bar with ceiling open-
ing precut. Ceiling opening must be slightly
larger than the outside diameter of the plaster
flange.
2.Open lever (A), expand bar hangers (B) to
approximately 24” and close lever to lock. Re-
fer to Figure 3.
3. Through an adjacent opening, position the
mounting frame with the plaster flange pass-
ing through the precut opening with the notches
on the bar hangers engaging the t-bar.
4. Secure the bar hangers to the t-bar by wire
or wiretie (by others) or bending end of bar
hanger. Refer to Figure 4.
5. Open lever and adjust mounting frame verti-
cally so that the bottom edge of the plaster
flange is flush or slightly above the bottom edge
of the ceiling panel.
7.
If fine tune adjustment from below ceiling is
required:
Loosen (2) 5/16” screws (A) 180° apart,
allowing fixture to drop fown so bottom edge of
plaster flange will be slightly above edge of
ceiling material.
Read and familiarize yourself with the no-
menclature and instructions before starting
installation.
Turn off electricity at the breaker panel or
fuse box and follow National Electrical Code
regulations.
Figure 1
Figure 2
A
B
C
D
F
E
G
A
Figure 3
Figure 4
A
Seitenansicht 0
1 2

Inhaltsverzeichnis

Seite 1 - Figure 4

For Your Protection, Read Carefully- Risk of fire. Do not install insu-lation within 3 inches of fixture sides or wir-ing compartment, nor above the f

Seite 2

J-box is approved for through wiring with 4 No. 12 AWG in and out. Six 1/2” orthree 3/4” knockouts are available. Use feed wire with insulation rated

Kommentare zu diesen Handbüchern

Keine Kommentare